roads - Road Network Projection
Iterative least cost path and minimum spanning tree
methods for projecting forest road networks. The methods
connect a set of target points to an existing road network
using 'igraph' <https://igraph.org> to identify least cost
routes. The cost of constructing a road segment between
adjacent pixels is determined by a user supplied weight raster
and a weight function; options include the average of adjacent
weight raster values, and a function of the elevation
differences between adjacent cells that penalizes steep grades.
These road network projection methods are intended for
integration into R workflows and modelling frameworks used for
forecasting forest change, and can be applied over multiple
time-steps without rebuilding a graph at each time-step.